A log with no end time

On elev psychos, this lesson comes with:

  • Every exercise checked the moment it is answered
  • A hint exactly when it is needed
  • Progress tracking, chapter by chapter
Practise on elev psychos

This lesson is part of the subscription. A full chapter for free: Numbers

A log: one row per event, in the order in which they started, and a category column that repeats from one row to the next. The key move is to rebuild what is written nowhere (the end time, the working time) with the conventions of the introduction, and to group the rows of the same category yourself.

A bakery in Haifa makes three products every morning: bourekas, baguettes and pitas. The table describes the eight batches of one day, labeled with the letters A to H. For each batch, it gives the product, the start time, the total duration in minutes, the number of breaks, the length of the longest of these breaks in minutes (empty cell: no break) and the number of pieces that came out of the oven. The end time is not shown.

Notes. The total duration includes the breaks. A batch is “in progress” from its start time to its end time, both times included. For a given product, the number of pieces made per minute of work is always the same; breaks do not count as work.

The batches of one morning
BatchProductStartTotal duration (min)Number of breaksLongest break (min)Pieces
APitas5:00800960
BPitas6:3090120840
CBourekas7:10155350425
DBaguettes8:00600240
EPitas8:4075224480
FBourekas9:25110236300
GBaguettes9:50130345280
HPitas10:30450540

An empty cell in the “Longest break” column means that the batch had no break.

For example: batch B, pitas, started at 6:30 and lasted 9090 minutes, breaks included; it had a single break, of 2020 minutes, and 840840 pitas came out of it.

Interactive activity

You first: redo the example

Total duration (min)

Number of breaks

Longest break (min)

How many pitas did batch B produce per minute of work? Tap the cells of the example, in order.

Total duration: 9090 minutes, breaks included.

A single break: so the longest one is the only one.

It lasts 2020 minutes: 90−20=7090 - 20 = 70 minutes of work.

840840 pitas.

1212
9.339.33
Show the answer and the solution

You divided by the total duration: the 2020 minutes of break produce nothing.

4242
Show the answer and the solution

You divided by the break, not by the work.

84070=12\dfrac{840}{70} = 12 pitas per minute. Batch A confirms it: 96080=12\dfrac{960}{80} = 12, with no break.

Do the activity on elev psychos

Each question is answered on its own: a piece of data that it adds holds only for that question.

Exercises

Exercise 1

Fill in the blanks: at exactly 9:50, ___ batches are in progress, ___ of them bourekas.

  1. A44; 22
  2. B33; 22
  3. C22; 11
  4. D33; 11
Show the answer and the solution

Answer: D 33; 11

Worked solution:

C: 7:10+155 min=9:45{\text{C: 7:10} + 155\text{ min} = \text{9:45}}

Batch C, bourekas, has been finished for 55 minutes at 9:50: it does not count.

E: 8:40+75 min=9:55{\text{E: 8:40} + 75\text{ min} = \text{9:55}}

Batch E, pitas, is still in progress.

F: 9:25+110 min=11:15{\text{F: 9:25} + 110\text{ min} = \text{11:15}}

Batch F, bourekas, is in progress.

G: starts at 9:50{\text{G: starts at 9:50}}

Batch G starts at exactly 9:50: the start time is included, so it is in progress. D ended at 9:00 and H only starts at 10:30.

3 batches, 1 of them bourekas{3 \text{ batches, } 1 \text{ of them bourekas}}

E, F and G; only F is a batch of bourekas.

33; 11. The end time is in no cell: you have to add it yourself, batch by batch. 44; 22 counts batch C, finished at 9:45: that is the mistake of someone who stops at the start time and sees “7:10, 155155 minutes, so still in progress”. 22; 11 leaves out G, which starts at exactly 9:50, forgetting that the endpoint is included. 33; 22 combines both mistakes: C counted instead of G, hence two bourekas batches. The two blanks are linked: the second depends on the exact list found for the first.

Check the answer on elev psychos — Exercise 1

Exercise 2

How many pitas, on average, did a batch of pitas produce that day?

  1. A760760
  2. B705705
  3. C352.5352.5
  4. D940940
Show the answer and the solution

Answer: B 705705

Worked solution:

A, B, E, H{\text{A, B, E, H}}

First group the rows of the product: four batches of pitas, scattered through the log, the last one at the very bottom.

960+840+480+540=2,820{960 + 840 + 480 + 540 = 2{,}820}

The total of pitas out of the oven.

2,8204=705{\dfrac{2{,}820}{4} = 705}

Divide by the number of pita batches, and by that alone.

705705. A conditional average is decided by the divisor: it is the number of rows kept by the filter. 352.5352.5 divides the right total by the 88 batches of the day. 940940 divides it by 33, the number of products. 760760 forgets batch H, the last row of the table, and averages only 960960, 840840 and 480480.

Check the answer on elev psychos — Exercise 2

Exercise 3

A batch is called choppy if its longest break lasts more than a third of its total duration. Which of these batches is choppy?

  1. ABatch F
  2. BBatch C
  3. CBatch E
  4. DBatch G
Show the answer and the solution

Answer: D Batch G

Worked solution:

C: 1553≈51.7>50{\text{C: } \dfrac{155}{3} \approx 51.7 > 50}

Its 5050-minute break, the longest in the table, stays under a third of 155155 minutes.

E: 753=25>24{\text{E: } \dfrac{75}{3} = 25 > 24}

Within one minute, but 2424 does not exceed 2525.

F: 1103≈36.7>36{\text{F: } \dfrac{110}{3} \approx 36.7 > 36}

Just below again.

G: 1303≈43.3<45{\text{G: } \dfrac{130}{3} \approx 43.3 < 45}

The 4545-minute break exceeds a third of 130130 minutes: G is choppy.

Batch G. The definition is relative: each break is compared with the duration of ITS batch, and the calculation has to be done for each option. Batch C has the longest break in the table in absolute terms, 5050 minutes, but also the longest batch: that is the trap for anyone who reads the break column alone. E and F fail by a minute at most (2424 against 2525, 3636 against 36.736.7): they catch anyone who rounds the third or settles for “about right”.

Check the answer on elev psychos — Exercise 3

Did your child get it?

On elev psychos, every exercise is checked the moment your child answers, and a hint comes right when they get stuck.

Practise on elev psychos

Exercise 4

For how long, in all, was at least one of the two batches D and E in progress?

  1. A22 h 1515 min
  2. B11 h 5555 min
  3. C11 h 3535 min
  4. D2020 minutes
Show the answer and the solution

Answer: B 11 h 5555 min

Worked solution:

D: 8:00→9:00{\text{D: 8:00} \to \text{9:00}}

Start at 8:00, 6060 minutes.

E: 8:40→9:55{\text{E: 8:40} \to \text{9:55}}

Start at 8:40, 7575 minutes: E starts before D ends.

8:00→9:55=115 min{\text{8:00} \to \text{9:55} = 115\text{ min}}

The union of the two intervals goes from the first start to the last end.

60+75−20=115{60 + 75 - 20 = 115}

The same result through the durations: the 2020 shared minutes, from 8:40 to 9:00, are counted only once.

11 h 5555 min. The two batches overlap, so you cannot add their durations. 22 h 1515 min is exactly that addition, 60+75=13560 + 75 = 135 minutes, which counts the 2020 shared minutes twice. 2020 minutes answers another question: the time during which both were in progress at the same time. 11 h 3535 min removes the overlap twice, and gives the time during which only one of the two was in progress.

Check the answer on elev psychos — Exercise 4

Exercise 5

For which product can you not deduce from the table the exact number of pieces made per minute of work?

  1. AThe pitas
  2. BNone: it can be calculated for all three products
  3. CThe bourekas
  4. DThe baguettes
Show the answer and the solution

Answer: C The bourekas

Worked solution:

A: 96080=12{\text{A: } \dfrac{960}{80} = 12}

A batch of pitas with no break: its 8080 minutes are all work. The rate for pitas is known.

D: 24060=4{\text{D: } \dfrac{240}{60} = 4}

A batch of baguettes with no break: the rate for baguettes is known, whatever the three breaks of G.

C: 3 breaks, F: 2 breaks{\text{C: 3 breaks, F: 2 breaks}}

Both bourekas batches have several breaks, and the table gives only the longest: the total length of their breaks is unknown.

F: 36<breaks≤72  ⇒  38≤work<74{\text{F: } 36 < \text{breaks} \le 72 \;\Rightarrow\; 38 \le \text{work} < 74}

For F, 300300 bourekas in a working time that can range from 3838 to almost 7474 minutes: the rate is only bounded.

The bourekas. The working time of a batch is known only if you know all its breaks: that is the case when it has none, or only one (its longest is then the only one). The pitas and the baguettes each have a batch with no break; the bourekas have none. The baguettes trap anyone who stops at G and its three breaks: one usable batch is enough, since the rate is the same for the whole product. The pitas set the same trap with E. None is the answer of someone who reads the column as the total length of the breaks, while it gives only the longest one.

Check the answer on elev psychos — Exercise 5

Exercise 6

At what time did batch F end?

  1. A11:51
  2. B11:15
  3. C11:05
  4. D10:39
Show the answer and the solution

Answer: B 11:15

Worked solution:

9:25+110 min{9{:}25 + 110 \text{ min}}

The total duration, breaks included.

=11:15{= 11{:}15}

110110 minutes is 11 h 5050 min.

11:15. 11:51 adds the 3636-minute break again, though it is already included; 10:39 subtracts it.

Check the answer on elev psychos — Exercise 6

Exercise 7

How many minutes of break did batch E have in all?

Show the answer and the solution

Answer: 35

Worked solution:

96080=12{\dfrac{960}{80} = 12}

Pitas: 1212 per minute of work (batch A, with no break).

48012=40{\dfrac{480}{12} = 40}

So batch E worked 4040 minutes.

75−40=35{75 - 40 = 35}

The rest of its total duration is breaks.

3535 minutes. The table gives only the longest (2424 min); the total is rebuilt through the rate of the product.

Check the answer on elev psychos — Exercise 7

Exercise 8

Batch G lasted longer than batch C.

Show the answer and the solution

Answer: False

Worked solution:

130<155{130 < 155}

The two total durations.

False. G ends later (12:00 against 9:45), but it started later: ending late is not lasting long.

Check the answer on elev psychos — Exercise 8

Exercise 9

How many minutes of break did batch G have in all?

Show the answer and the solution

Answer: 60

Worked solution:

24060=4{\dfrac{240}{60} = 4}

Baguettes: 44 per minute of work (batch D, with no break).

2804=70{\dfrac{280}{4} = 70}

G worked 7070 minutes.

130−70=60{130 - 70 = 60}

The rest is breaks.

6060 minutes. Three breaks, the longest of which is 4545 minutes: the other two make 1515 minutes together.

Check the answer on elev psychos — Exercise 9

Exercise 10

Which batches started during batch C and ended after it?

  1. ABatch D
  2. BBatch F
  3. CBatch E
  4. DBatches E and F
Show the answer and the solution

Answer: D Batches E and F

Worked solution:

C:7:10→9:45{C: 7{:}10 \to 9{:}45}

The end of C is rebuilt: 155155 minutes.

D:8:00→9:00{D: 8{:}00 \to 9{:}00}

D ends before C.

E:8:40→9:55F:9:25→11:15{E: 8{:}40 \to 9{:}55 \qquad F: 9{:}25 \to 11{:}15}

Both end after 9:45.

E and F. You need the end time of three rows, and none is written: that is the missing column.

Check the answer on elev psychos — Exercise 10

Keep practising on elev psychos

Videos, instant checking and a path that follows your child's pace, for every chapter of their grade.

This lesson is part of the subscription. A full chapter for free: Numbers