Three questions, one for each form the test brings back year after year: the time together, the quantity two produce together, and relative rates.
At each step of the solution, ask yourself what you would have done before you read on. The gap between your reflex and the method is what teaches you something.
✓
I set the whole job to 1, and wrote each rate as x1.
✓
I added rates, never times.
✓
I flipped the combined rate to get back to the time.
✓
My result fits within the bounds: between half of the faster time and the faster time.
✓
I read the unit asked for: hours or minutes.
✓
What empties was subtracted, not added.
תרגיל 1 מתוך 3
Sarah tidies the storeroom in 4 hours. David tidies the same storeroom in 12 hours. If they work together at their usual rates, how many hours will it take them to tidy the storeroom?
Question 1, replayed: the bounds
024
- 3 h
- 8 h
- 16 h
- 6 h
The faster one takes 4 h. Together, the time falls between 24=2 h and 4 h. Judge each option.
תרגיל 2 מתוך 3
Two printers each work at a constant rate. Printer A prints a batch of 1,000 posters in 20 hours; printer B prints the same batch in 5 hours. The two ran together for 8 hours. How many posters did they print?
Question 2, replayed: eight hours of printing
⏱ 0 min
A: 0B: 0goal: 8 h
A: 50 posters per hour. B: 200. Move the clock forward to 8 h.
תרגיל 3 מתוך 3
Each day, Yoni spends half as many hours at work as Dana, but in one hour he produces one and a half times what Dana produces. Dana completes a job in 9 days. How many days will Yoni need to complete the same job?
Question 3, replayed: Yoni and Dana
┅ Dana■ Yoni
The square is one day of Dana: width = hours, height = hourly rate, area = output. Apply the two factors of Yoni.
עוד אין תרגיל פתור בשלב הזה.
- נקודות
- 0
- תשובות נכונות
- 0
- לחזרה היומית
- 0
בשלב הבא Eight more questions