Ten questions in the test format, from the simplest to the most demanding. Start the timer: ten minutes for the whole set, one minute per question, the pace of test day. Mark your ten answers before you open any solution; then check them all at once and count your points out of ten.
Eight or more: you have mastered this set, move on to the next one. Six or seven: reread the solution of each mistake and name the trap that caught you. Five or fewer: go back to the lesson before you continue.
תרגיל 1 מתוך 10
In a bakery, a customer comes in every 4 minutes on average, and each customer buys 3 baguettes on average. How many baguettes does the bakery sell in one hour, on average?
תרגיל 2 מתוך 10
Two pumps together fill a 300-liter tank. The first delivers 40 liters per minute, the second 20 liters per minute. How many minutes does it take to fill the empty tank?
תרגיל 3 מתוך 10
Six tilers lay 90 m² of tiles in 5 hours. At the same rate per tiler, how many m² do four tilers lay in 8 hours?
תרגיל 4 מתוך 10
A print shop receives two orders. Order A keeps 3 presses busy for 8 hours; order B keeps 4 presses busy for 6 hours. All the presses are identical and work at the same rate. Which of the following statements is true?
תרגיל 5 מתוך 10
In the same amount of time, Noa sorts 3 files while Tom sorts 2. Each keeps a constant rate. Tom sorts a pile of files in 12 minutes. How many minutes does Noa take to sort an identical pile alone?
תרגיל 6 מתוך 10
A spool holds 60 m of thread, but the last 12 meters, stuck to the core, cannot be used. A sewing machine uses 6 m of thread per hour, and the workshop runs it 5 hours a day. How many days do 15 spools last?
תרגיל 7 מתוך 10
A tap fills an empty vat in 3 hours. The drain valve, opened alone, would empty the full vat in 4 hours. The vat is empty, and the tap and the valve are opened at the same time. After how many hours is the vat full?
תרגיל 8 מתוך 10
Eight bricklayers were supposed to build a wall in 6 days. After 2 days of work, four of them leave for another site, and the others go on at the same rate. How many days does the job last in all?
תרגיל 9 מתוך 10
Two printers work together, each at its own constant rate; the first prints twice as fast as the second. Together, they print one third of a batch in 2 hours. How many hours would the second printer alone need to print the whole batch?
תרגיל 10 מתוך 10
Working 6 hours a day, a cabinetmaker finishes an order in 10 days. If he now works only 4 hours a day, at the same hourly rate, how many days does he take to finish the same order?