Three questions, one for each form the test brings back year after year: the time together, the quantity two produce together, and relative rates.
For each one, try it on your own first, then open the solution. It walks through the reasoning and names the trap the question sets.
At each step of the solution, ask yourself what you would have done before you read on. The gap between your reflex and the method is what teaches you something.
Checklist: verify before you mark your answer
I set the whole job to 1, and wrote each rate as .
I added rates, never times.
I flipped the combined rate to get back to the time.
My result fits within the bounds: between half of the faster time and the faster time.
I read the unit asked for: hours or minutes.
What empties was subtracted, not added.
Interactive activity
Question 1, replayed: the bounds
Sarah takes 4 h, David 12 h. Judge the four answer choices.
Do the activity on elev psychosInteractive activity
Question 2, replayed: eight hours of printing
A prints 50 posters per hour, B prints 200.
Do the activity on elev psychosInteractive activity
Question 3, replayed: Yoni and Dana
Yoni works half as many hours as Dana, but one and a half times as fast. Dana finishes in 9 days.
Do the activity on elev psychosEight more questions
Same method, different clothes: a staggered start, three taps, machines added along the way.
Exercises
Exercise 1
Sarah tidies the storeroom in 4 hours. David tidies the same storeroom in 12 hours. If they work together at their usual rates, how many hours will it take them to tidy the storeroom?
Show the answer and the solution
Answer: D
Worked solution:
The bounds first. The faster one takes 4 hours: the answer is between 2 and 4. Three choices out of four have just fallen, before any computation.
Write the two rates: Sarah tidies a quarter of the storeroom per hour, David a twelfth.
Together, a third of the storeroom per hour.
Flip the rate to get the time.
3 hours. The two distractors are built on the classic mistakes: is the sum of the times, their average. Both are more than 4 hours, which would mean that together they go slower than Sarah alone. Impossible, and the bounds tell you so in five seconds.
Exercise 2
Two printers each work at a constant rate. Printer A prints a batch of posters in 20 hours; printer B prints the same batch in 5 hours. The two ran together for 8 hours. How many posters did they print?
Show the answer and the solution
Answer: C
Worked solution:
Here the question asks not for a time but for a quantity. Keep the same formula, read forward: quantity = rate time.
The rate is the quantity divided by the time.
B is four times as fast as A.
The rates add up: always the same line.
Eight hours at this rate.
posters, that is, two whole batches. You could also stay in batches: of a batch per hour, so batches. The distractor rewards whoever adds the times somewhere; , whoever counts ten hours instead of eight.
Exercise 3
Each day, Yoni spends half as many hours at work as Dana, but in one hour he produces one and a half times what Dana produces. Dana completes a job in 9 days. How many days will Yoni need to complete the same job?
Show the answer and the solution
Answer: A
Worked solution:
No absolute number, only comparisons. So you are not looking for a rate, but for the ratio between what Yoni produces in one day and what Dana produces.
The two factors multiply.
Yoni works half as long, but one and a half times as fast: in one day he produces three quarters of what Dana produces.
Producing three quarters per day means taking times as many days.
12 days. The check that saves you: Yoni produces less per day, so he needs more days than 9. The choices and fall at once: they are the ones you get by multiplying instead of dividing.
Did your child get it?
On elev psychos, every exercise is checked the moment your child answers, and a hint comes right when they get stuck.
Practise on elev psychosExercise 4
Crew A digs a trench in 10 days, crew B digs the same trench in 15 days. Together, how many days do they take to dig it?
Show the answer and the solution
Answer: 6
Worked solution:
the rates add up
flip
6 days. Check: between 5 and 10 days. The sum (25) and the average (12.5) fall outside the band.
Exercise 5
Ana does a job in 6 hours, Ben does the same job in 12 hours. Ana first works alone for 2 hours, then Ben joins her. How long will they work together?
Show the answer and the solution
Answer: B h min
Worked solution:
what Ana did alone
what is left to do
the rate of the two together
time = remainder over rate, then h min
2 h 40 min. h forgets Ben (), h forgets Ana. A staggered start is settled by first taking away what is already done.
Exercise 6
If A does a job in 5 hours and B in 20 hours, then together they do it in 4 hours.
Show the answer and the solution
Answer: True
Worked solution:
a quarter of the job per hour
True. And 4 h does fall between 2.5 h and 5 h.
Exercise 7
Three taps fill a pool in 2 h, 3 h and 6 h. Fill in the blanks.
Per hour, together: 1/2 + 1/3 + 1/6 = ____ pool. The pool is full in ____ hour.
Show the answer and the solution
Answer: Per hour, together: 1/2 + 1/3 + 1/6 = 1 pool. The pool is full in 1 hour.
Worked solution:
three rates add up just like two
one pool per hour
Three taps, the same move: add the rates, then flip.
Exercise 8
One printer prints 30 pages per minute, another 45. Together, how many minutes do they take to print 600 pages?
Show the answer and the solution
Answer: 8
Worked solution:
pages per minute, the two together
time = quantity over rate
8 minutes. The rates are already in units: you do not set the job to 1.
Exercise 9
For each sentence from a question: do you set the job equal to 1, or is the rate already given per unit of time?
Show the answer and the solution
Answer: A bricklayer builds the wall in 8 hours. — Job = 1 · A pump delivers 30 liters per minute. — Rate already given · A robot sorts 200 letters per hour. — Rate already given · A painter finishes the front of the house in 3 days. — Job = 1 · A leak would empty the tank in 12 hours. — Job = 1 · A cashier serves 40 customers per hour. — Rate already given
Worked solution:
a time for the whole job: set it to 1
a rate already given: add it as it is
The word that gives it away: “in hours” sets 1, “per hour” already gives the rate.
Exercise 10
Eight identical machines produce an order in 6 days. After 2 days, 8 more identical machines are added. How many days does the production last in all?
Show the answer and the solution
Answer: D
Worked solution:
machine-days for the whole order
done during the first two days
the remainder, with sixteen machines
do not forget the first two days
4 days. days divides everything by two as if the sixteen machines had run from the start; days would forget the start.
Exercise 11
Order these teams of two, from fastest to slowest together.
Show the answer and the solution
Answer: h and h · h and h · h and h · h and h
Worked solution:
product over sum
. The fastest team is not the one with the smallest average time.